Road Closure on Young Road from Hazeldean Road to Turnball Avenue


Greenbelt Construction Limited.
5151 Albion RoadGloucester, ON   K1X 1A2Tel: (613) 822-1064 Fax: (613) 822-0111
 

                        

 

 AUTHORIZATION TO

CLOSE STREET

                                          FOR THE PURPOSE OF CONSTRUCTION

In accordance with The Road Activity By-law 2003-445, permission is hereby granted for you to close the following roadway: 

On: Young Road                From: Hazeldean Road          To: Turnbull Avenue

 

Under the following conditions:

Duration:

  • Wednesday, 17 April 2013 to Wednesday, 1 May 2013.

Signage/Conditions:

  • Follow the terms and conditions as outlined in the contract ISD12-3002 in regards to traffic management.
  • Provide “Road Closed – Do Not Enter” (TC-7 urban + TC-7tA + Rb-92) signs on Young immediately north of Hazeldean facing northbound traffic.  Provide any additional signs, barricades, barrels or other traffic control devices as required to completely close the roadway at this location.
  • Provide “Road Closed – Do Not Enter” (TC-7 urban + TC-7tA + Rb-92) signs on Young immediately north of the work zone facing southbound traffic.  Provide any additional signs, barricades, barrels or other traffic control devices as required to completely close the roadway at this location.
  • Provide “Road Closed – Local Traffic Only – No Exit” (TC-7 urban + TC-7tA + TC-7tB + TC-39) signs on Young immediately south of Turnbull facing southbound traffic. 
  • Contractor to provide and install all signs, barrels or other traffic control devices  to close (in accordance with OTM Book 7) the eastbound left turn lane at the intersection of  Young at Hazeldean. If required, maintain a portion to allow for access for the mall immediately west of this roadway.
  • Provide signs, barricades, barrels or other traffic control devices at the work zone as may be necessary to ensure both public and worker safety.
  • Maintain access to adjacent dwellings at all times.  This includes emergency vehicle access. 
  • Maintain pedestrian access and provide pedestrian detour routes if necessary. 
  • At any time during the work, the City Traffic Management Inspector, at his/her discretion, may instruct the contractor to undertake portions of the work after 6:30 PM or on weekends.  He/she may also require the contractor to supply and install additional traffic control devices (signs, barrels etc) and/or retain point duty police to control traffic.  The contractor is responsible for all costs.