Councillor Allan Hubley
- Home
- OC Transpo
- Planning
- Infrastructure
- Hydro Ottawa
- Other Projects
- Road Work
- Transportation Master Plan
- Highway 417 expansion
- Hope Side Road and Eagleson Road Intersection Modification
- Roundabout at Stonehaven and Steeple Chase/Bridgestone
- Stonehaven and Eagleson Widening Project
- Stonehaven Drive and Bridlepark Drive Intersection Notice to Commence Work
- Terence Matthews Crescent: Authorization to Close Street
- Terry Fox Drive and Westphalian Avenue Proposed Modification
- Terry Fox Proposed Roadway Modification – 525 metres south of Fernbank Road
- West End Flood Investigation Action Plan
- Abbeyhill Area Rehabilitation
- Barrow Cr. Overland Flow
- Castlefrank Rd. Regrading & Laurie Ct.
- Clarence Maheral Park Earth Berm
- Dog Bone Berm
- Hazeldean Pumping Station Improvements
- Hazeldean Road, Abbotsford Road and Morrena Road Regrading
- Inlet Control Devices
- Overland Drainage Improvements at Dunoon Place
- Overland Drainage Improvements at Oakburn Road
- Peary Way Earth Berm
- Protective Plumbing Program
- Hazeldean Watermain
- Community
- Allan in News
- Events
- Photos
- About Allan
- Contact
Clarence Maheral Park Earth Berm
The existing catch basins and leads to the park were inadequate for the proposed sewer needs in Clarence Maheral Park. Therefore, the requirement for a new storm sewer drainage system with a new connection to the existing storm sewer on Castlefrank Road. Due to the new connection in Castlefrank our contractor was required to install a new maintenance hole on the existing 750 mm storm sewer.
Construction work to construct a new storm sewer connection in Castlefrank Road between Sheldrake Drive and Glamorgan Drive at Clarence Maheral Park entrance is scheduled to begin on Monday, May 14, 2012 and will require temporary lane closure until completion of the work in end May 2012.
Castlefrank Road will be narrowed to one lane in one direction where the work is occurring and traffic will be flagged through the construction zone. The lane will be narrow and cyclists will be required to use the vehicle lane. Slow moving traffic and delays are expected during construction. Drivers are asked to use extra caution while following signs through the construction zone or consider alternate routes.
Thank you in advance for your patience.
Project Manager:
Todd Penfound, C.E.T.
Project Manager, Design and Construction Municipal West
(613) 580-2424, Ext. 16005